Quantcast

North Bay Business Journal

Monday, December 2, 2013, 6:00 am

Top Real Estate Projects 2013: St. Joseph expands Napa, Santa Rosa hospitals

Category: Medical

By

Print Friendly Print Friendly    

Share this item

    2013 Top Real Estate Projects in the North BayNAPA and SANTA ROSA — Upgrade and expansion projects were initiated at two local St. Joseph Health hospitals in 2013.

    Herman Family Acute Care Pavilion, Napa

    A three-story, 72,000-square-foot acute care center has been added to the Queen of the Valley Hospital in Napa. It is among the first in California on track to become gold LEED certified for health care facilities.

    new Herman Acute Care Pavilion at the Queen of the Valley Hospital

    The main entrance to the new Herman Acute Care Pavilion at the Queen of the Valley Hospital in Napa.

    The pavilion incorporates evidence-based design, which is the process of basing decisions about the built environment on credible research to achieve the best possible outcomes for patients, and operating efficiency for staff.

    The design utilized the latest virtual 3-D building information modeling (BIM) technique to create the new smart operating rooms, patient rooms and laboratories. BIM is part of the innovative project delivery system employed at the Queen to minimize paper and maximize communication among project team members.

    Online virtual construction project management (VICO) software was deployed to augment the BIM model and produce the fourth and fifth dimensions of schedule and cost for project coordination in real time.

    The Herman Family Pavilion houses the region’s first “hybrid” operating room, an OR suite that combines advanced imaging capabilities with robotics and traditional surgery. This technology will aid physicians during the most difficult and complex cancer, heart and brain procedures.

    The pavilion will also include six “smart ORs” outfitted with flat screen monitors and an in-room camera system for remote communication between physicians and their colleagues.

    These rooms are reinforced with robust steel framing in the event of an earthquake, and to minimize vibrations during sensitive operating procedures.

    There are 20 large intensive care rooms filled with ambient light and designed to encourage family-assisted patient care, and featuring sleeper sofas and desks with data outlets.

    A new clinical and pathology laboratory, equipped with the latest technology, also contains a video system linked to operating rooms, providing real-time communications between surgeons and pathologists.

    This project was substantially completed in June at a cost of $120 million. CDHP, licensing and final Office of State Health Planning and Development (OSHPD) signoff are scheduled for December, and the facility is planning to open and accept patients in February 2014.

    Expanded emergency, trauma center, Santa Rosa

    Santa Rosa Memorial Hospital’s Emergency Department Trauma Center is the area’s only level 2 Center specializing in trauma, neurosurgery, and orthopedics 24 hours a day — as well as treating the chronically ill, injured patients those suffering from life-threatening conditions such as stroke and heart attack.

    The recent renovation added 50 percent more space to the Emergency Department.

    The 4,228-square-foot expansion significantly enlarged the existing 19-bay, 9,280-square-foot ER that houses 26 private treatment rooms, bringing the total ER space to 13,500 square feet. The cost of this project is $15 million.

    A sunlit, enlarged waiting area with seating for 60 people has been added along with an expanded registration and reception area. There is additional space for physician consultations with patient families. A furnished outdoor patio and healing garden were also part of this project.

    Six patient rooms have enclosed walls and private doors — an improvement over less soundproof privacy drapes. By June 2014, all treatment beds in Memorial’s ER will be similarly upgraded.

    This upgrade is also designed to more quickly triage and care for patients with less-acute conditions.

    “We’re excited to open this state-of-the-art facility,” said Todd Salnas, president of St. Joseph Health in Sonoma County. “It means more personalized, private care for our patients and greater comfort. In addition, the expanded space will also enable us to reduce patient wait times.”

    This well-planned project helps ensure that all patients are served more efficiently as patient volumes increase.

    The hospital treats approximately 1,650 trauma patients annually and some 38,925 patients are seen in Memorial’s Emergency Department each year — an average of about 100 patients per day.

    The Bay Area Consumer’s Checkbook recently rated Santa Rosa Memorial as Sonoma County’s top provider of emergency care for complex cases.

    “As one of the leading providers of integrated health care and community outreach services for Sonoma County and the North Coast region, Memorial’s growing network of services reflects the ongoing commitment of St. Joseph Health to continually improve the health and quality of life of people in the communities we serve,” Mr. Salnas said.

    2013 Top Real Estate Projects in the North Bay project snapshot

    Queen of the Valley Hospital Herman Family Acute Care Pavilion

    1000 Trancas St., Napa

    • Owner: St. Joseph Health Systems
    • Completion: September 2013
    • Cost: $65 million
    • General contractor: Wright Contracting
    • Architect: CO Architects
    • Civil engineering: BKF
    • Mechanical & plumbing: EXP Engineers
    • Structural engineer: KPFF Engineers
    • Pile drilling: Anderson Drilling
    • Concrete: Devincenzi Concrete
    • Plumbing & HVAC: FW Spencer Mechanical
    • Roofing: Alcal Roofing
    • Windows: Bagatelos Architectural Glass
    • Construction framing, drywall & acoustical ceilings: Stockman Construction
    • Insulation: Coast insulation
    • Fire sprinklers: Transbay Fire Protection
    • Cabinetry & countertops: Myer & Reader, Inc.
    • Doors & hardware: Boyett Doors & Hardware
    • Tile, flooring & carpeting: JB Floors
    • Masonry: SW Mertz Masonry
    • Structural steel: Schuff Steel
    • Painting & finishes: Jerry Thompson & Sons
    • Sheet metal: Air Systems

    Santa Rosa Memorial Hospital Emergency Department and Trauma Center Renovations

    1165 Montgomery Dr., Santa Rosa

    • Owner: St. Joseph Health Systems
    • Construction start: May 2012
    • Completion: June 2014
    • Cost: $11.4 million
    • General contractor: Wright Contracting
    • Architect: RBB Architects, Inc.
    • Engineering: BKF
    • Cost estimator: Rick Grossman
    • Construction management: Van Pelt Construction Services
    • Electrical engineer: N.A. Cohen Group
    • Mechanical engineer: ME-Engineers
    • Structural engineer: KPFF
    • Lighting: Blakeslee Electric
    • Plumbing: Westside Mechanical
    • Roofing: Alcal Specialty Contracting
    • Windows: Progress Glass
    • Insulation, drywall & acoustical ceiling: Stockham Construction
    • Site grading & paving: Able General Engineering
    • Fire sprinklers: Plumber Plus
    • HVAC & sheet metal: IES
    • Cabinetry & countertops: Westmark
    • Doors & hardware: Pacific Door
    • Tile, flooring & carpeting: Conklin Flooring
    • Demolition: Daniel O. Davis
    • Concrete: Devincenzi Concrete
    • Masonry: Adriano Masonry
    • Structural steel & welding: F&M Steel
    • Painting & finishes: Brians & Thompson

    Copyright © 1988–2014 North Bay Business Journal
    View the policy for linking to website content.

    Print Friendly Print Friendly    

    Submit Your Comments

    Required

    Required, will not be published

    Comments are moderated and generally will be posted if they are on-topic and not abusive. For more information, please see our Comments and Letters Policy. To share this item by email or social media, use the links above.

    Do not use this form to contact people, companies or organizations mentioned in this story. Contact them directly. Private messages left here will be deleted.