American Canyon company's innovation makes waves at new SFMOMA

[caption id="attachment_93136" align="alignnone" width="500"] An aerial architectural rendering of the new San Francisco Museum of Modern Art façade (credit: MIR and Snøhetta)[/caption]

AMERICAN CANYON -- In working on the $610 million renovation and expansion of the San Francisco Museum of Modern Art, fiber-reinforced composites fabricator Kreysler & Associates is getting noticed throughout North America for allowing wider-ranging beauty on building exteriors via a lighter-weight, fire-resistant "skin" panel.

For most of its 25 years, Kreysler (707-552-3500, has been primarily employing its 3-D fabrication design and CNC milling capabilities to create large sculptures, interior enhancements such as large attractive acoustical panels for concert halls, and architectural reconstructions. Then the company was contacted about producing architectural  the inside of the museum, commonly known as SFMOMA. Kreysler suggested the exterior could get similar treatment, but not with five or six molds for panels as some contractors and fabricators had recommended but one for each of the proposed 700 panels that would cover 84,000 square feet of walls 10 stories high.

[caption id="attachment_93135" align="alignleft" width="280"] A sculpture terrace extending from Howard to Minna streets will be framed on one side by a vibrant vertical garden. (credit: MIR and Snøhetta)[/caption]

"This is the biggest job we've ever done," founder and President William Kreysler said.

Kreysler & Associates now has 38 employees, up 15 with the start of the SFMOMA project from the stable 25-person workforce for two decades. Sales volume has more than doubled to $5 million to $6 million in the past two years.

Five hundred of the uniquely rippling panels have been completed and moved to the plant's yard on the five-acre property to await transportation to the Mare Island industrial complex in Vallejo. Exterior cladding contractor Enclos opened a 50,000-square-foot assembly plant there nearly a year ago to handle the SFMOMA project and several others in the Bay Area and recently expanded it by 18,000 square feet.

The SFMOMA project will add about 70,000 square feet of exhibition and support space to the existing 225,000-square-foot building, which was erected in 1995. Construction began last summer and is scheduled for completion in early 2016.

comments powered by Disqus
© The North Bay Business Journal  |  Terms of Service |  Privacy Policy |  Jobs With Us |  RSS |  Advertising |  Sonoma Media Investments
Switch to our Mobile View